The renovation process,
from start to closeout
A large renovation moves through recognizable stages. Knowing who does what at each stage, and where your decisions are due, makes the project calmer and the result better.

The opening conversation and site visit
The process begins with a conversation about what you want and a visit to the house. The builder looks at the structure, the systems, the access and the surroundings, and listens to what matters to you.
Your role at this stage is to be candid about priorities, constraints and the way you live. Bring your architect or designer if you have one.
Expect questions about timing, access to the property and any deadlines, such as a sale, a season or a family event. Those details shape how the work is planned.
Preconstruction and design coordination
Next comes scope development and early budgeting, usually alongside the architect, designer and engineers. This is the stage for testing ideas against cost and for asking the city about rules that may change the plan.
Your decisions here shape everything that follows: the scope, the level of finish, and which parts of the house are opened up. Our preconstruction guide describes this stage in more detail.
Permitting, the agreement and selections
Plans are submitted for permit, which is handled by the contractor and design team with input from you. Who reviews them, and how long that takes, depends on the city and the type of project. Our guide on permits and private providers explains the options.
You and the builder also settle the agreement, including allowances, the payment schedule and how changes are priced. Your attorney should review it.
While the permit is under review, selections are made and long-lead items are ordered. The site is then prepared with protection for floors and neighbors, a staging plan, and arrangements for utilities and security. Owners are often busiest elsewhere at this stage, so block time on your calendar.
Demolition, structure and the work inside the walls
Demolition reveals what was hidden, and any adjustment is discussed and priced before the work is done. Structural work follows, then the rough-in of electrical, plumbing and mechanical systems, each checked at inspection before walls are closed.
Owner decisions in this stage are mostly about locations: outlets, switches, lighting, plumbing points and equipment. These are cheap to place before the walls close and expensive to move after.
Finishes, punch list and closeout
Once the walls are closed, the finish trades take over: tile, stone, millwork, paint, glass, hardware and lighting. This is where the house takes the shape you imagined, and quality of coordination is most visible.
Near the end, the builder and you walk the house and list anything needing correction. Closeout includes final inspections, documents, and a handover of what you need to live in and maintain the house.
Why selections drive the schedule
The schedule is often controlled less by the crew than by the items you choose. Windows, doors, stone, cabinetry and special fixtures can take a long time to arrive, and the rough-in work depends on their exact dimensions.
A tub, a range, a vanity or a slab of stone dictates where framing, plumbing and electrical must go. If the selection is late, the trades behind it wait. That is general experience of how renovation works, which is why decisions made early, and a clear record of what is due and when, protect the schedule.
Questions owners ask
Who is my main contact during the renovation?+
With Johnson, you deal directly with Mike, who stays involved from early planning through closeout rather than handing the project off after signing.
Where do owners most often hold up a project?+
Selections. Late decisions on windows, stone, cabinetry or fixtures can hold up the trades that depend on them.
Do I need to be on site during construction?+
Not every day. Regular walk-throughs and prompt answers to questions are usually more useful than constant presence.
What is a punch list?+
It is a list, made near the end, of items to correct or complete before the project is accepted as finished.